-- card: 81550 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 64774 -- name: Setting Lag Times 2 -- part 1 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=11 top=58 right=86 bottom=233 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 2 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=238 top=58 right=165 bottom=460 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: -- part 3 (button) -- low flags: 00 -- high flags: A003 -- rect: left=29 top=133 right=153 bottom=214 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: Lag Time Dialog Box ----- HyperTalk script ----- on mouseUp go card id 77420 end mouseUp -- part 4 (field) -- low flags: 01 -- high flags: 0002 -- rect: left=409 top=260 right=275 bottom=464 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: pagexofy -- part contents for background part 31 ----- text ----- Setting Up a Project -- part contents for background part 32 ----- text ----- Setting Lag Times -- part contents for card part 1 ----- text ----- To add start-to-start lag between two tasks: -- part contents for background part 6 ----- text ----- Select the line connecting the two tasks. Choose Lag Time from the Task menu. Click the Start to Start button. In the Lag Duration field, type the number of units of lag time you want to add between the start of the first task and the start of the second task. Click OK. -- part contents for background part 27 ----- text ----- 1. 2. 3. 4. 5. -- part contents for card part 2 ----- text ----- Important: With start-to-start lag, there is no longer a dependency between the finish of one task and the start of the next. Double-check the flow of your project to see if any other tasks depend on that first task finishing. You may want to add a dependency line between that task and another one to its right in the Schedule Chart. -- part contents for card part 4 ----- text ----- 2 of 2